Not so much a blog as a weather report! Lots of fog, freezing the air and the ground, weakening the already weak sunshine. Creating a big fat inversion layer above Loch Lomond but allowing the grandeur of the mountains to rise above.
Not quite there yet...
The sensibilities of moving in tomorrow aren't really there as progress has been quite slow since our builder went on holiday last week. He's a very good project manager so I think it would all look a little further advanced if he'd been around. We perhaps 'ought' to wait another week but....the jobs fill the time available and Steve and I need to move in. The kitchen is messy but there isn't much left to do there and we could reasonably use it at the weekend after a good clean. The childrens' bedrooms are being carpetted tomorrow so we'll get their furniture in and blinds fitted on Saturday if possible with a view to that being our first night.
The granite worktop was fitted last weekend, just 2 weeks after templating, and we're very pleased with the result. The team were a very pleasant trio from Estonia and Lithuania. The plastic protective wrap on the doors and drawers is coming away on this photo and together with the general high dust and grime levels doesn't inspire but we reckon on using this kitchen this weekend. The caravan hob is just about adequate and the oven ok only for warming stuff. Last summer it took nephew Tommy Boy nearly an hour to part bake/part burn a pizza. We have managed to cook a good selection of food over the past 9 months, we've even entertained a few times, but a real kitchen is now beckoning.
Winter time...and the living ain't easy
Turning Chillier part two
A continuation of the previous blog - the technology sometimes prevents such things. The step shown left was finished on Friday. The stone for the whole wall and the step has been recovered from the demolished farmhouse save for the coping stones which have been bought from a nearby farm where the wall had fallen down. The weather forecast for later in the week is distinctly cooler with daytime temps nearer zero and we have had our first conversations around the subject of 'how long can we/will we stay in the caravan'. No decisions to move out yet as most of the time its really not difficult. Naturally we would prefer more space and a lovely big bathroom but that is, quite literally, a work in progress. The office is in an old toolhouse adjacent to the barn which adjoins the house and with its high level of insulation it is a very pleasant place. Steve has been insulating the water pipes within the caravan and we need to tackle the ones outside where they are not underground.
Four Months of Caravan Living
We've been living in the caravan for just over 4 months now, its hard to believe and generally has worked a lot better and been much easier than we expected (all those years of camping provides good training!). Yesterday was a horribly cold damp foggy day though and I felt chilled to the bone. By the evening I just couldn't get warm and the prospect of a warm bathroom in a real house would have been lovely. Its a better morning outside today but the water heater won't work and after attempts to remedy the problem we've called the engineer who is coming out this afternoon thankfully. If it doesn't work I'll be 'phoning a friend'.
Chilly Morning
Last night we had our first true frost. The air temp hit freezing outside the caravan and the lowest point inside was 4.8 deg C -the hard part is surfacing from under the duvet. The views are fabulous today, its very easy to see where the big windows of the house will look out to.
Check Availability
Tags
animals architectural design awards, cottages, sustainability bees caravan cottages Curlew Cottage days out design dogs eastcambusmoon electric vehicles foundation fruit and veg production furniture gold award great review green toursim hard landscaping heat pump heat recovery hens holiday accommodation insulation interiors lambing landscaping loch lomond low energy measures national park nature outings owls people photoshoot roof solar PV timber frame Training ventilation walks website windows
Blog archive
- June 2019 (1 entry)
- February 2019 (1 entry)
- December 2018 (1 entry)
- November 2018 (1 entry)
- April 2018 (1 entry)
- December 2017 (1 entry)
- October 2017 (2 entries)
- June 2017 (1 entry)
- April 2017 (2 entries)
- March 2017 (1 entry)
- February 2017 (1 entry)
- February 2016 (1 entry)
- June 2014 (1 entry)
- June 2013 (1 entry)
- April 2013 (1 entry)
- February 2013 (1 entry)
- May 2012 (2 entries)
- April 2012 (1 entry)
- March 2012 (2 entries)
- December 2011 (1 entry)
- August 2011 (2 entries)
- June 2011 (4 entries)
- May 2011 (4 entries)
- April 2011 (1 entry)
- December 2010 (4 entries)
- October 2010 (2 entries)
- August 2010 (2 entries)
- December 2009 (1 entry)
- November 2009 (2 entries)
- October 2009 (2 entries)
- September 2009 (3 entries)
- August 2009 (1 entry)
- July 2009 (2 entries)
- June 2009 (3 entries)
- May 2009 (7 entries)
- April 2009 (2 entries)
- March 2009 (2 entries)
- February 2009 (1 entry)
- January 2009 (4 entries)
- December 2008 (2 entries)
- November 2008 (1 entry)
- June 2008 (5 entries)
- May 2008 (4 entries)
- April 2008 (11 entries)
- March 2008 (14 entries)
- February 2008 (9 entries)
- January 2008 (12 entries)
- December 2007 (11 entries)
- November 2007 (11 entries)
- October 2007 (10 entries)
- September 2007 (6 entries)