Since last week when I mentioned that it hadn't rained much it has of course chucked it down most days this week! Ironically we had no water for most of yesterday as there was a burst water main somewhere on the west side of Loch Lomond which is a good distance from here.
Even the joiners finished early yesterday as they were soaked to the skin but this was also around the time that Steve and I realised/believed that some of the roof windows were not in the positions we had expected/designed. We arranged for the architect to visit site this morning....
The main problem was with the vertical position of the two main bedroom windows and the ensuite window, in that when standing up and viewed out from the inside, they are below level of vision! This is made even worse by the fact that the soffits from the top of the window frame are set square to the window (as shown in the photo above), which appeared to be an error that had crept into the final tender drawings. We were keen to resolve this asap as the sarking board is to be fitted next week with slaters booked the week after, and thus the opportunity will soon be lost (forever) to make adjustments.
Discussion on site with joiner and architect largely sorted the problem with an agreed plan to set the three offending windows higher in the roof, and an amended detail on the upper soffits to bring them closer to the horizontal as intended. As an aside, our joiner rightly cautioned this latter detail to ensure that sufficient insulation space is allowed for between soffit and sarking to avoid cold bridging and even condensation.
The view right is from the top of the scaffolding looking back to our 'trailer park' and some of the farm buildings. The office roof is just visibile to the right of the caravans.
Rather wierdly in the last week we've found 2 dead hares and a dead rabbit in different places around the steading area but none of them appear to have any injuries.....
Comments: 0 (Add)
Check Availability
Tags
animals architectural design awards, cottages, sustainability bees caravan cottages Curlew Cottage days out design dogs eastcambusmoon electric vehicles foundation fruit and veg production furniture gold award great review green toursim hard landscaping heat pump heat recovery hens holiday accommodation insulation interiors lambing landscaping loch lomond low energy measures national park nature outings owls people photoshoot roof solar PV timber frame Training ventilation walks website windows
Blog archive
- June 2019 (1 entry)
- February 2019 (1 entry)
- December 2018 (1 entry)
- November 2018 (1 entry)
- April 2018 (1 entry)
- December 2017 (1 entry)
- October 2017 (2 entries)
- June 2017 (1 entry)
- April 2017 (2 entries)
- March 2017 (1 entry)
- February 2017 (1 entry)
- February 2016 (1 entry)
- June 2014 (1 entry)
- June 2013 (1 entry)
- April 2013 (1 entry)
- February 2013 (1 entry)
- May 2012 (2 entries)
- April 2012 (1 entry)
- March 2012 (2 entries)
- December 2011 (1 entry)
- August 2011 (2 entries)
- June 2011 (4 entries)
- May 2011 (4 entries)
- April 2011 (1 entry)
- December 2010 (4 entries)
- October 2010 (2 entries)
- August 2010 (2 entries)
- December 2009 (1 entry)
- November 2009 (2 entries)
- October 2009 (2 entries)
- September 2009 (3 entries)
- August 2009 (1 entry)
- July 2009 (2 entries)
- June 2009 (3 entries)
- May 2009 (7 entries)
- April 2009 (2 entries)
- March 2009 (2 entries)
- February 2009 (1 entry)
- January 2009 (4 entries)
- December 2008 (2 entries)
- November 2008 (1 entry)
- June 2008 (5 entries)
- May 2008 (4 entries)
- April 2008 (11 entries)
- March 2008 (14 entries)
- February 2008 (9 entries)
- January 2008 (12 entries)
- December 2007 (11 entries)
- November 2007 (11 entries)
- October 2007 (10 entries)
- September 2007 (6 entries)