Progress...


... has been fairly rapid during the long days of a Scottish summer. Since pouring the floor slabs the timber frame has gone up in a matter of weeks, with work now starting on building up the old dairy's stone walls another 400mm to roof eaves level so our guests will have plenty of headroom upstairs!


Construction design is similar to the house, using an insulated timber frame clad with woodfibre board on the outside for extra insulation and to reduce thermal bridging. This keeps the wind out and, with the help of fancy tapes and membranes on the inside, the heat in. Heating is to be from a ground source heat pump and solar thermal panels, with solar PV offsetting electricity use. Inside we just have underfloor heating on the ground floor which will keep things cosy during the chilly winter months!

Over the next couple of months we should see the roof windows in and the roofs slated, then hopefully, the windows and doors will have have arrive so the cottages can be wind and watertight before the cooler and wetter months...roll on Autumn!

Comments: 0 (Add)

Check Availability

Loading