Heat pump installation
Work started on installing our heat pump last week. We have specified a Nibe 1240-5kW - the smallest capacity they make - with integral 'tank-in-tank' hot water cylinder. It 's a very neat unit, being the same size as a 1.9m tall fridge freezer. The pipework next to it will be ultimately enclosed in a cupboard which will still have some storage space at the front, whilst allowing access to the pipes at the back if need be.
Specifying a heat pump uses the opposite logic to specifiying a combustion boiler, as it must be just undersized to operate at its most efficient when taking into account the building's heat loss and anticipated peak heat requirement. The reason for this is that heat pumps dislike being 'cycled' - switched on and off - and actually benefit from running for longer periods at a time than conventional boilers. In extreme circumstances where, say, there is significant heat and hot water demand (eg. Christmas with visitors!) then the heat pump employs an electrical element to supplement itself, but the trick is to set things up so this hardly needs to be used at all, electricity being a relatively high-carbon form of energy.
The unit is being installed in our utility room where all the pipes from the ground loop, hot and cold water, underfloor heating and 1st floor radiators/towel radiators terminate. The guys are making a neat job of connecting this spaghetti together and hopefully by late next week we should be in good shape to switch on and get some heat into the 40 tonnes or so of concrete which forms the floor slab.
As it happens one of the founders of the heat pump supply company - Ecoliving - popped round yesterday to look at our windows (he's building an extension to his own house!) and he told me that the heat pump even had a setting to dry the floor slab out over a four day cycle, this will be important before we fit engineered board flooring.
Anderson Floor Warming of Glasgow are doing all of the plumbing in the house using a German plastic/aluminium pipe system. Hot and cold feeds are fed to manifolds from which each tap is fed, thus reducing pipe runs. Also the hot water feed is circulated from and back to the hot water tank at peak use periods (controlled by a timer) such that when a hot tap is switched on, hot water appears almost instantly.
Apart from the plumbers, the rest of the guys on site have never built a house with a heat pump in it and we are all waiting in anticipation for switch on!
Check Availability
Tags
animals architectural design awards, cottages, sustainability bees caravan cottages Curlew Cottage days out design dogs eastcambusmoon electric vehicles foundation fruit and veg production furniture gold award great review green toursim hard landscaping heat pump heat recovery hens holiday accommodation insulation interiors lambing landscaping loch lomond low energy measures national park nature outings owls people photoshoot roof solar PV timber frame Training ventilation walks website windows
Blog archive
- June 2019 (1 entry)
- February 2019 (1 entry)
- December 2018 (1 entry)
- November 2018 (1 entry)
- April 2018 (1 entry)
- December 2017 (1 entry)
- October 2017 (2 entries)
- June 2017 (1 entry)
- April 2017 (2 entries)
- March 2017 (1 entry)
- February 2017 (1 entry)
- February 2016 (1 entry)
- June 2014 (1 entry)
- June 2013 (1 entry)
- April 2013 (1 entry)
- February 2013 (1 entry)
- May 2012 (2 entries)
- April 2012 (1 entry)
- March 2012 (2 entries)
- December 2011 (1 entry)
- August 2011 (2 entries)
- June 2011 (4 entries)
- May 2011 (4 entries)
- April 2011 (1 entry)
- December 2010 (4 entries)
- October 2010 (2 entries)
- August 2010 (2 entries)
- December 2009 (1 entry)
- November 2009 (2 entries)
- October 2009 (2 entries)
- September 2009 (3 entries)
- August 2009 (1 entry)
- July 2009 (2 entries)
- June 2009 (3 entries)
- May 2009 (7 entries)
- April 2009 (2 entries)
- March 2009 (2 entries)
- February 2009 (1 entry)
- January 2009 (4 entries)
- December 2008 (2 entries)
- November 2008 (1 entry)
- June 2008 (5 entries)
- May 2008 (4 entries)
- April 2008 (11 entries)
- March 2008 (14 entries)
- February 2008 (9 entries)
- January 2008 (12 entries)
- December 2007 (11 entries)
- November 2007 (11 entries)
- October 2007 (10 entries)
- September 2007 (6 entries)