Shopping and snowmen
This morning we went to check out kitchens at John Lewis. There are quite a few elements of the build package we are responsible for supplying, kitchens and bathrooms being two of the more visually obvious but other things such as the ground source heat pump, pavatherm and internal flooring rest with us. This gives us more control over the final result although the whole design and build process is all consuming and full of decisions to be made. Being on site every day is cause and effect of that.We are keen to have a bright red kitchen as the whole room is incredibly light and could easily take a strong colour. There are a few on the market but our current favourite is JL's colour collection in high gloss burgundy. We know their quality is good and that is the key to a good kitchen. We went to MFI the other day who had a nice looking kitchen too but the units and drawers wobbled as you opened and closed them, the fittings were plastic rather than metal so not sure they would have lasted terribly long.This afternoon we made 3 snowmen before the blizzard took over.The joiners were fixing the air/vapour membrane to the internal walls but headed home as the weather deteriorated.
Winter time...and the living ain't easy
Happy New Year from us all. Hope it brings good health and good fortune to you.
Photo taken at 4pm this afternoon as the light was starting to fail. Steve had returned from a meeting in Kinross-shire a couple of hours previously and was concerned about the road conditions as I was travelling from Perthshire. In this age of instant communications the fact that I didn't have a mobile phone today (cos he was using mine!) heightened the concern......if we weren't constantly available we'd never think twice about it.
Being in the caravan is fine with the snow because at least it means the air temperature is around zero whereas in the week before Christmas it was quite quite miserable with several days of frozen pipes making life unpleasant. In a strange kind of way, it also adds an extra layer of insulation to the caravan roof, igloo-style! We were pleased to be away for Christmas even if only for a few days.
Hogmanay and the first couple of days of 2008 were the usual round of house parties/invitations so we've spent many hours in real houses with good friends, lovely heating and comfortable living. Thankfully Scotland is blessed with two public holidays at New Year as well as a huge level of hospitality (which came first?).
We are moving out of the caravan in 2 weeks, initially to house sit for a friend who is going on holiday and then we're taking a 7 week let of a holiday house nearby. This will bring us to mid March. Originally our builder had indicated a completion around the end of February and there have been delays, particularly with the timber frame manufacturer and material shortages so we shall catch up with him next week for a revised date. After 7 months of living in the caravan we are now soooo looking forward to increased comfort, space and amenity.

Its Freezing
It is very cold indeed. Last night -5 and today it hasn't hit zero yet, presumably it won't now as the light starts to diminish. Sunset is 1545 today. Sleeping in the caravan was just fine but getting out of bed is much more tricky until the heating has kicked in. The children don't seem to notice but have resorted to putting their slippers on now. As caravans are generally very poorly insulated the temperature difference between inside and outside is very small - yesterday when we returned home it was +3 degrees inside when it was +1 deg outside. Thank goodness it's not our permanent home.
The slating has started and is looking good already. The slates are being double nailed as we're in a very exposed and windy spot. This will help the slates stay in place although does make replacement more tricky should that be necessary in the future. The first fit plumbing is in place and the first fit electrics are in progress. The underfloor heating to the bathrooms is in place but needs adjusting in the ensuite as the installation team haven't taken account of changes since the early plans. There's plenty of activity on site as the final load of pavatherm which arrived on Saturday is being fixed onto the north gable. There is also an artic full of insulation parked on the road incapable of turning...apparently waiting for a smaller lorry to take off the load and deliver onto site.
Saturday morning
Its just turned 9am on Saturday and we've taken a further delivery of Pavatherm Plus insulating board so the joiners can finish off the external insulation layer. There was relatively little activity on site yesterday as we were waiting for this delivery and the sliding door sets (3 off). The latter is now likely to be next week, but apparently has arrived from Penrith. I think these are around 6 weeks overdue and it's dissappointing that the windows from Norway arrived some four weeks ago and are now installed having been ordered at the same time as the patio doors! The main front door is also late and is sourced from Sweden.
The other happening this morning relates to the lame hen. Although it had a couple of better days in the past week it has now gone lame in both legs and is incapable of independent movement. So we had to wring its neck. I thought I could do this yesterday when it probably needed to be done but hen started clucking at me and I just couldn't so now that Steve has returned from working away he did the deed this morning. No, we're not eating it. There's no meat to speak of anyway but as we're not sure what's wrong with it it seems the best move....anyone with greater knowledge please advise!
We've got a fox prowling around. I need to repair/replace a bit of wire at the bottom of the gate to the hen pen before we go out this morning. There are fox prints on the top of the nesting box and on the roof of the hen house so we need to be sure to lock up quickly at dusk.I wonder if that explains the dead hares and rabbit the other week although I thought there would be more damage to the prey?
Rural living!......... we're off to Edinburgh today to see Santa, reindeer, lights, ice sculptures etc.
Lots of trades on site.
The underfloor heating folk have been here today. We are not having any heating upstairs except for underfloor heating in the 2 bathrooms. This will be served by the ground source heat pump as per the ground floor, albeit in trays rather than embedded in the concrete as they are on the ground floor. As the first floor is laid the guys have to work from the underside of that floor, I can't imagine that's easy but they seem to be managing just fine.
The 6 joiners who are here are covering various tasks - the exciting one for us is seeing the main first floor picture window being framed out. A number of adjustments have been made to this but it is now looking good. Inside the first stages of first floor interior walls are being established; the children have already decided which 'bedroom' is theirs by virtue of which windows they have adopted. There are lots of issues we are trying to resolve - the wrong cladding being one. More on that later... Weather report - its positively balmy here today. I think we are becoming so hardy and acclimitised that we don't realise its December.
Search and book
Tags
animals architectural design awards, cottages, sustainability bees caravan cottages Curlew Cottage days out design dogs eastcambusmoon electric vehicles foundation fruit and veg production furniture gold award great review green toursim hard landscaping heat pump heat recovery hens holiday accommodation insulation interiors lambing landscaping loch lomond low energy measures national park nature outings owls people photoshoot roof solar PV timber frame Training ventilation walks website windows
Blog archive
- June 2019 (1 entry)
- February 2019 (1 entry)
- December 2018 (1 entry)
- November 2018 (1 entry)
- April 2018 (1 entry)
- December 2017 (1 entry)
- October 2017 (2 entries)
- June 2017 (1 entry)
- April 2017 (2 entries)
- March 2017 (1 entry)
- February 2017 (1 entry)
- February 2016 (1 entry)
- June 2014 (1 entry)
- June 2013 (1 entry)
- April 2013 (1 entry)
- February 2013 (1 entry)
- May 2012 (2 entries)
- April 2012 (1 entry)
- March 2012 (2 entries)
- December 2011 (1 entry)
- August 2011 (2 entries)
- June 2011 (4 entries)
- May 2011 (4 entries)
- April 2011 (1 entry)
- December 2010 (4 entries)
- October 2010 (2 entries)
- August 2010 (2 entries)
- December 2009 (1 entry)
- November 2009 (2 entries)
- October 2009 (2 entries)
- September 2009 (3 entries)
- August 2009 (1 entry)
- July 2009 (2 entries)
- June 2009 (3 entries)
- May 2009 (7 entries)
- April 2009 (2 entries)
- March 2009 (2 entries)
- February 2009 (1 entry)
- January 2009 (4 entries)
- December 2008 (2 entries)
- November 2008 (1 entry)
- June 2008 (5 entries)
- May 2008 (4 entries)
- April 2008 (11 entries)
- March 2008 (14 entries)
- February 2008 (9 entries)
- January 2008 (12 entries)
- December 2007 (11 entries)
- November 2007 (11 entries)
- October 2007 (10 entries)
- September 2007 (6 entries)