Lots of trades on site.
The underfloor heating folk have been here today. We are not having any heating upstairs except for underfloor heating in the 2 bathrooms. This will be served by the ground source heat pump as per the ground floor, albeit in trays rather than embedded in the concrete as they are on the ground floor. As the first floor is laid the guys have to work from the underside of that floor, I can't imagine that's easy but they seem to be managing just fine.
The 6 joiners who are here are covering various tasks - the exciting one for us is seeing the main first floor picture window being framed out. A number of adjustments have been made to this but it is now looking good. Inside the first stages of first floor interior walls are being established; the children have already decided which 'bedroom' is theirs by virtue of which windows they have adopted. There are lots of issues we are trying to resolve - the wrong cladding being one. More on that later... Weather report - its positively balmy here today. I think we are becoming so hardy and acclimitised that we don't realise its December.
Wall Insulation
Thankfully we have plenty of storage space as the two main forms of wall insulation were delivered last week. The Rockwool Flexi 140mm batts are fairly standard, bulky, widely available and commonly used. The pavatex 'Pavatherm Plus' woodfibre board in the right of the picture is the non-standard element of our wall insulation. The latter is an insulating wood fibre board which is effective in reducing the U-value ie improving the thermal efficiency, in improving acoustic protection (not that we have any external noise problems!) and providing summer heat protection. It is used as an overcladding system for the timber frame in this application and will effectively 'block' most thermal through the frame and aid airtightness thus giving the best chance of this and the Rockwool insulation working at its best.
Today in the glorious sunshine the joiners made a start on the south gable. Also the suppliers of the Pavatherm board visited to discuss the product and its installation with the guys on site as well as Steve and I. Last winter when we were looking at specification/design issues for the house (that seems such a long long time ago!!!!!!) we had concern about it being an appropriate material in the wet West of Scotland as the insulation should be fixed dry but we were reassured by architects who had used it on self-builds in Scotland. The AECB also provided contacts through their forum which was beneficial in this sort of decision. The joiner had not used the product before but by the end of a very productive day he rated it very highly and enjoyed working with it.
On other matters the larch cladding arrived this afternoon but the timber frame manufacturer has sent the wrong profile so that will need to be replaced. Hopefully they will do this quickly. Also or architect has sent through revised details for the porch so that can go ahead now.
Slates have also arrived. The electrician and the chimney man are due tomorrow. Bathrooms and the 3 really large fixed and sliding windows are due on Wednesday. Bathrooms should have arrived last week but didn't...more chasing!
One Week On
Can't believe we haven't posted anything since last Tuesday....however its because so much has been happening on site. Aside from that we're very busy at home and work.
Saturday late afternoon we had our first snow of the year and there was a fair blizzard that evening. As usual at this elevation it thawed rapidly on the ground but the hills look fabulous. We have beautiful pink skies this morning - ideal for the slating to start today. Since last Monday the whole roof has been sheeted with sarking board, most of the windows are in place, the site has been tidied up, some scaffolding taken away, decisions on finer design detail made.
We had very wild weather and the joiners were on the roof a lot - it was so windy, wet and cold last week which was not pleasant at all.
Here's a few photos.............more news later.
1st Insulation arrives
Today we took delivery of the first batch of insulation - 140mm Rockwool Flexi for the walls. Tomorrow we expect the 60mm woodfibre board - 'Pavatherm Plus' - to be delivered, which will be used as an outer cladding to the timber frame walls. This is where we depart from conventional timber frame construction where the cladding adds additional insulation and reduces 'thermal bridging' through the timber studs in the frame.
The wall design is based on a detail developed for timber frame buildings by the AECB to meet their Silver standard for energy efficiency and we will add detail drawings alongside photos when the insulation is fitted.
Search and book
Tags
animals architectural design awards, cottages, sustainability bees caravan cottages Curlew Cottage days out design dogs eastcambusmoon electric vehicles foundation fruit and veg production furniture gold award great review green toursim hard landscaping heat pump heat recovery hens holiday accommodation insulation interiors lambing landscaping loch lomond low energy measures national park nature outings owls people photoshoot roof solar PV timber frame Training ventilation walks website windows
Blog archive
- June 2019 (1 entry)
- February 2019 (1 entry)
- December 2018 (1 entry)
- November 2018 (1 entry)
- April 2018 (1 entry)
- December 2017 (1 entry)
- October 2017 (2 entries)
- June 2017 (1 entry)
- April 2017 (2 entries)
- March 2017 (1 entry)
- February 2017 (1 entry)
- February 2016 (1 entry)
- June 2014 (1 entry)
- June 2013 (1 entry)
- April 2013 (1 entry)
- February 2013 (1 entry)
- May 2012 (2 entries)
- April 2012 (1 entry)
- March 2012 (2 entries)
- December 2011 (1 entry)
- August 2011 (2 entries)
- June 2011 (4 entries)
- May 2011 (4 entries)
- April 2011 (1 entry)
- December 2010 (4 entries)
- October 2010 (2 entries)
- August 2010 (2 entries)
- December 2009 (1 entry)
- November 2009 (2 entries)
- October 2009 (2 entries)
- September 2009 (3 entries)
- August 2009 (1 entry)
- July 2009 (2 entries)
- June 2009 (3 entries)
- May 2009 (7 entries)
- April 2009 (2 entries)
- March 2009 (2 entries)
- February 2009 (1 entry)
- January 2009 (4 entries)
- December 2008 (2 entries)
- November 2008 (1 entry)
- June 2008 (5 entries)
- May 2008 (4 entries)
- April 2008 (11 entries)
- March 2008 (14 entries)
- February 2008 (9 entries)
- January 2008 (12 entries)
- December 2007 (11 entries)
- November 2007 (11 entries)
- October 2007 (10 entries)
- September 2007 (6 entries)