The staircase is 'in production'......not sure what stage that means or when it'll arrive.

This lunchtime I've been buying 110sqm of external slabs to be here by the end of the week; large wardrobe for the hallway to be here tomorrow (Steve has a slot between 8.30 and 10pm this eve to collect that!?); securing the contractor and price for grubbing up and tamping down the massive concrete base of the old dairy shed opposite the front door; finalising the details for the grant contribution to the cost of the heat pump.
Now back to earned employment for the rest of the day.

We walked up our local hill the Dumpling this morning which is always a pleasure, the view of Loch Lomond is awe-inspiring every single time. We've had lovely weather this weekend with tiny specks of dry snow sneaking in from the east. Yesterday was tiring as it was spent in town at various furniture/plumbing/DIY places so everyone was grumpy and fed up. Today has been filled with fresh air and sunshine with walks and outdoor activities. This afternoon we used some spray paint to mark out the areas immediately outside the house which will be hard landscaped for footpaths and patios, it wasn't too difficult (away from the cold easterly) to imagine summer evening barbecues. We then salvaged trailer-loads of wood from the site which are surplus to the build but will provide fuel for the wood burning stove for many years to come.
This week is massively busy with the kitchen and utility room fit-outs starting tomorrow, the external hard landscaping including sorting out the levels around the house will be underway, lighting is being fitted and the tiler continues with the ground floor slates.
There's no staircase yet, the design was in theory signed off in December, delivery 5 weeks thereafter, some apparent communication issue between architect and timber frame manufacturer whereby one expected measurements from the other which didn't happen, builder expecting delivery, calls not being returned.

local wildlife

Its noisy here tonight - half an hour ago there were 2? foxes shrieking outside, I haven't heard that noise before and thought someone was in trouble or an animal was being killed, it being such a piercing shriek. I managed to catch them in the beam of the big torch so they scamped off. An amazing and most unpleasant noise. Then a barn owl has been hunting and there's a whole lot more shrieking going on.
There is some woodland 100metres east of the farm which provides plenty of cover for foxes and deer. Two weeks ago a young deer was killed by a vehicle just past the farm entrance, 20 minutes later it had been reclaimed by a neighbour for lunch and dog food (sorry are you eating?).
The huge greylag geese population we have locally over winter has significantly moved on to pastures new, the curlews are here with their wonderful call and a 'swarm' of starlings were doing that fabulous sweeping dance through the sky.
A magical sight yesterday was watching two brown hares boxing in the field below the house and caravan. There is a big population of brown hare here, they are beautiful creatures. Springwatch here we come, I'll be Kate Humble rather than Bill Oddie though!

Hens eat fries!

The apple trees in position - if you look closely you can see 2 McDonalds fries on the cardboard, the scaffolders thought the hens might like a snack

The exterior revealed

The scaffolding is just about down after a day and a half of disassembly and the render is dazzingly white. The polythene over the ground floor windows will be removed after the renderers have finished covering the grey you can see at the bottom of the house, this may happen tomorrow depending on the extent of rain forecast. We haven't had rain for a week now I think.

Next week we'll work out the design on the ground for external hard landscaping close to the house. The architect drew a rectangular area of paving on a plan but the levels on the west side need a bit more thought so we're just going to work to our own design in conjunction with the groundworks crew. Some number of tonnes of hardcore are arriving tomorrow afternoon to start that process. There's always something arriving on site, today's delivery were the 122 boxes of kitchen which the fitters will commence construction and installation on Tuesday. The appliances arrived yesterday, the kitchen sink last Friday but we still need to buy taps...a job for the weekend.
Two days ago the vinyl flooring went down in the 2 upstairs bathrooms so Willie the plumber has now fixed the sanitary ware in both those rooms. The gorgeous bath tub is in the ensuite.
In the ground floor bathroom Billy the tiler has started fixing the slate tiles, setting up the lines took a while as this slate will run through the majority of the ground floor.