Holiday Cottages Underway
So here we are starting a new and exciting adventure at East Cambusmoon. Three years ago we moved into our house, beautifully designed and immensely energy efficient, see here. We adopted a very low energy approach to the design and the construction detailing which focussed on significant levels of insulation, a high standard of air-tightness, strong passive solar design and a ground source heat pump for the heating and hot water, supported by a small PV array and mechanical heat recovery and ventilation. When we were at the design stage 4 years ago this approach was not widely taken but, even in the short time since we moved in, more people and architects are looking more broadly at how homes and buildings are managed environmentally. We joined the AECB and adopted their Silver Standard for energy use and carbon emissions. In truth the house has far out-performed this standard and even in the last particularly cold winter was warm all day every day at very low cost.
The main difference between the projects are that the house was a new build and the holiday cottages are a conversion of two very tired farm buildings. Notwithstanding our intentions to replicate some of the approaches we took with a brand new building we are very aware that we are renovating an old dairy and byre and will certainly be retaining the architectural features the buildings; the red sandstone which was quarried locally, the arch over the doorway and the window recess with wooden lintel.
Here we are creating two adjoining holiday cottages, one of two bedrooms, one of four. As we are in Loch Lomond & Trossachs National Park we hope that some of the year-round visitors to this stunningly scenic area might like to come and stay in the cosy warm luxury of our holiday cottages. As you can see we're just starting the conversion works and we'll do our best to record the journey on this blog.
The building story so far has been one of rapid change. The roofs have fallen in and the rubble cleared out; in the stone building (which will have two bedrooms) the 'hole' for the sliding patio doors has been punched through and the stone stockpiled for reuse; in the larger unit, which was brick built in the 1950s, the walls collapsed so extra blockwork and labour will be required; floor levels were equalised as existing floors sloped. Then we get into the first stage of serious insulation - the floor. So much heat is lost through the floor, don't waste it!
In the past week 200mm of polystyrene and polyeurathane insulation boards have been laid throughout the buildings and on top of this will float 30 tonnes of steel and concrete in the 4 bedroom unit and 15 tonnes of the same in the two bedroom unit. Before the concrete is poured the underfloor heating pipes are installed; this is done by fixing the pipework (large diameter polythene pipe ideal for use with heat pumps) to the steel reinforcement mesh with tie-wraps. This approach works well with ground source heat pumps which have lower operating temperatures than the more frequently used shallow tray form of underfloor heating. The concrete provides the thermal mass necessary to stabilise the temperature and keep those cottages lovely and warm when needed.We're using Anderson Floorwarming for the underfloor heating, hot and cold water systems, installation of the ground source heat pump and solar. We are happily working with the same builder, subcontractors and architect as we did on the house so its nice to see familiar faces back on site.
Comments: 0 (Add)
Check Availability
Tags
animals architectural design awards, cottages, sustainability bees caravan cottages Curlew Cottage days out design dogs eastcambusmoon electric vehicles foundation fruit and veg production furniture gold award great review green toursim hard landscaping heat pump heat recovery hens holiday accommodation insulation interiors lambing landscaping loch lomond low energy measures national park nature outings owls people photoshoot roof solar PV timber frame Training ventilation walks website windows
Blog archive
- June 2019 (1 entry)
- February 2019 (1 entry)
- December 2018 (1 entry)
- November 2018 (1 entry)
- April 2018 (1 entry)
- December 2017 (1 entry)
- October 2017 (2 entries)
- June 2017 (1 entry)
- April 2017 (2 entries)
- March 2017 (1 entry)
- February 2017 (1 entry)
- February 2016 (1 entry)
- June 2014 (1 entry)
- June 2013 (1 entry)
- April 2013 (1 entry)
- February 2013 (1 entry)
- May 2012 (2 entries)
- April 2012 (1 entry)
- March 2012 (2 entries)
- December 2011 (1 entry)
- August 2011 (2 entries)
- June 2011 (4 entries)
- May 2011 (4 entries)
- April 2011 (1 entry)
- December 2010 (4 entries)
- October 2010 (2 entries)
- August 2010 (2 entries)
- December 2009 (1 entry)
- November 2009 (2 entries)
- October 2009 (2 entries)
- September 2009 (3 entries)
- August 2009 (1 entry)
- July 2009 (2 entries)
- June 2009 (3 entries)
- May 2009 (7 entries)
- April 2009 (2 entries)
- March 2009 (2 entries)
- February 2009 (1 entry)
- January 2009 (4 entries)
- December 2008 (2 entries)
- November 2008 (1 entry)
- June 2008 (5 entries)
- May 2008 (4 entries)
- April 2008 (11 entries)
- March 2008 (14 entries)
- February 2008 (9 entries)
- January 2008 (12 entries)
- December 2007 (11 entries)
- November 2007 (11 entries)
- October 2007 (10 entries)
- September 2007 (6 entries)