As previously mentioned we have opted to use a ground source heat pump to provide both space and hot water heating. With no mains gas, an adjacent field and the opportunity to design a well insulated house from scratch with underfloor heating, the heat pump was the lowest carbon and lowest running cost option for East Cambusmoon.
For anyone considering a heat pump for their own house there aren't that many situations where it is the most cost effective and efficient choice, and certainly if you have the luxury of a mains gas supply a high efficiency gas boiler, coupled with say solar thermal panels will likely be a lower capital cost and running cost option than a heat pump doing both. If not on mains gas, then the costs need to be compared to LPG or oil and the decision will largely depend on the type of heating distribution system you already have, ie. radiators or underfloor heating. For the same heat input to a room, radiators need to be run at a higher temperature than underfloor heating simply because the heat emitter is concentrated into a relatively small wall hung panel, rather than the entire surface area of the floor. The problem with heat pumps is that their efficiency rapidly decreases in proportion to the heating medium temperature, such that running small radiaors from a heat pump is a bad idea. This can be alleviated to a certain extend by increasing the size of radiators so they can be run at a lower temperature.
Then there's the heat collection system, in our case this being a 300m length of 40mm diameter pipe buried 1.4m underground. This particular aspect of our build was a separate 'client item' from the main build contract so Debs, me, Stewart the digger driver and £60k's worth of band new JCB set to for four days of hard graft to get this pipe buried in the ground to in such a way as to absolutely maximise every joule of energy that could be sucked out of it .....which of course would be continuously be replenished by the sun. In effect, a huge solar panel!
In designing the collector system, we followed the heat pump manufacturer's (http://www.nibe.com/) advice on pipe depth, separaton and layout. Our supplier (http://www.ecoliving.info/) also offered advice on site and once certain of our plan, we got cracking! We ended up digging three 40m trenches, each 2m wide and 1.5m deep at 4m centres. We also imported 35 tonnes of sand to cover the pipe below and above to avoid the possiblity of damage from sharp rocks when backfilling and to ensure good contact with the ground. Bfore covering and backfilling, the pipe was pressure tsted and to finish off, fed into the house via the 'slow bend' duct pipes already built in to the floor slab.
Comments: 0 (Add)
Check Availability
Tags
animals architectural design awards, cottages, sustainability bees caravan cottages Curlew Cottage days out design dogs eastcambusmoon electric vehicles foundation fruit and veg production furniture gold award great review green toursim hard landscaping heat pump heat recovery hens holiday accommodation insulation interiors lambing landscaping loch lomond low energy measures national park nature outings owls people photoshoot roof solar PV timber frame Training ventilation walks website windows
Blog archive
- June 2019 (1 entry)
- February 2019 (1 entry)
- December 2018 (1 entry)
- November 2018 (1 entry)
- April 2018 (1 entry)
- December 2017 (1 entry)
- October 2017 (2 entries)
- June 2017 (1 entry)
- April 2017 (2 entries)
- March 2017 (1 entry)
- February 2017 (1 entry)
- February 2016 (1 entry)
- June 2014 (1 entry)
- June 2013 (1 entry)
- April 2013 (1 entry)
- February 2013 (1 entry)
- May 2012 (2 entries)
- April 2012 (1 entry)
- March 2012 (2 entries)
- December 2011 (1 entry)
- August 2011 (2 entries)
- June 2011 (4 entries)
- May 2011 (4 entries)
- April 2011 (1 entry)
- December 2010 (4 entries)
- October 2010 (2 entries)
- August 2010 (2 entries)
- December 2009 (1 entry)
- November 2009 (2 entries)
- October 2009 (2 entries)
- September 2009 (3 entries)
- August 2009 (1 entry)
- July 2009 (2 entries)
- June 2009 (3 entries)
- May 2009 (7 entries)
- April 2009 (2 entries)
- March 2009 (2 entries)
- February 2009 (1 entry)
- January 2009 (4 entries)
- December 2008 (2 entries)
- November 2008 (1 entry)
- June 2008 (5 entries)
- May 2008 (4 entries)
- April 2008 (11 entries)
- March 2008 (14 entries)
- February 2008 (9 entries)
- January 2008 (12 entries)
- December 2007 (11 entries)
- November 2007 (11 entries)
- October 2007 (10 entries)
- September 2007 (6 entries)