Up on the Roof

Since last week's blog progress has been slow but steady. The roof is quite involved and various references have been made back to the timber frame manufacturer and the strucural engineer during the course of the week. To an extent it appears to be over-engineered (but I'm only a surveyor!) We employed a structural engineer to undertake much of the design as this was meant to save time with the timber frame manufacturer; I'm not sure this has been achieved and certainly the cost seems to be a good chunk higher. If we did this again we would handle this aspect differently but 'it is what it is'. The gloom of some dreich November days don't help and I'm beginning to hate the small cold caravan bathroom!!

On the plus side - the house is looking fabulous, we love the creation of the structure and its a pleasure to show people around. Our ever professional builder has put 3 additional joiners on site today to help get the roof structure finished. The first delivery of windows arrived last Friday and we bought the majority of the contents of the 3 bathrooms last week. The pavatherm external insulation is late but hopefully on its way, we've been chasing that delivery today. There's always something to do, as well as the day job which pays the bills. Last week we received the first interim certificate and invoice.


The photos were taken on Friday 23rd, illustrating the late Autumn sunshine at 8.30am; good light levels falling on the east elevation of the house (top photo). It was still below freezing as we'd had -4degC that night; but the views are glorious. The piccie above right is of the dining area, with its 3.5m ceiling height and lovely big window and door openings. The photo below is the view from this room to the north/northwest.

Turning Chillier part two


A continuation of the previous blog - the technology sometimes prevents such things. The step shown left was finished on Friday. The stone for the whole wall and the step has been recovered from the demolished farmhouse save for the coping stones which have been bought from a nearby farm where the wall had fallen down. The weather forecast for later in the week is distinctly cooler with daytime temps nearer zero and we have had our first conversations around the subject of 'how long can we/will we stay in the caravan'. No decisions to move out yet as most of the time its really not difficult. Naturally we would prefer more space and a lovely big bathroom but that is, quite literally, a work in progress. The office is in an old toolhouse adjacent to the barn which adjoins the house and with its high level of insulation it is a very pleasant place. Steve has been insulating the water pipes within the caravan and we need to tackle the ones outside where they are not underground.

Turning Chillier

As Steve's previous blog mentions the first floor is in place and in response to Jane's query on keeping the water out you can see the blue sheeting which is keeping the worst of the rain out. Even so I don't think we're getting as much rain as usual for this time of year .....famous last words?!

The builder has lined up the slaters to do the roof in early December which is terrific news if all goes to plan. The 'hooded man' in the photo is Davie the joiner. Today he and his 2 lads attached all the rafter shoes to the ridge beam. I spent 15 mins at the top of the scaffolding before deciding it was too chilly and retired to the office which is lovely and toasty. It is terrific seeing the room formations and the height of the ground floor rooms.

Our friend Alan finished the wall late last week with the final stretch of coping stones and a rather fab step up to the chicken's enclosure. He found a curved piece of red sandstone from the demolished house and has utilised it in the step.

Daily Changes

The two joiners erected much of the ground floor on Monday and Tuesday which has been really exciting. Its terrific to see the rooms take shape and we are really pleased with the size of the window openings, particularly as we spent a long time last winter working through that element of the design. The joiners can't progress further until the steel arrives, this is delayed but due next Wednesday. In the meantime the scaffolders have been taking delivery of their kit and today have erected scaffolding on the west and south elevations. This photo is taken through the caravan window.

By and large we've had good weather since the start of the build, it is very mild at present which makes life comfortable for early mornings in the caravan.....however the past 2 days weather have included a large amount of rain and the area at the back of the house is somewhat muddy. Thankfully the caravans are on a concreted area.


Final photos today - 2 days collection of eggs and a piccie of Dora; generally the hens are laying 4 eggs per day which is quite good I think for ex battery hens and for the time of year. We've no idea if some hens are not laying at all but those that are have been using the nesting boxes. At this time of year with the daily reduction in light levels we can expect them to lay fewer eggs but at the moment our hens seem quite consistent.

Exciting Progress On Site


One of the landmark days on site - the joiners arrived at 7.50am, the first lorry and trailer load of timber frame a few minutes later. The first photo was taken around 9am as the timber was being moved to the house; the joiners spent much of the morning undertaking check measurements etc (apparently it was all within 5mm so that was good!) and moving the timber to the right place.

We had some wild Autumn weather at the weekend so it was a chilly post-frontal breeze as well as getting muddier around the site.

Around lunchtime the first wall was put in place on the wall plate - this being the northwest corner of the house where the guest bedroom is situated. As I was chatting on the phone the rest of that end of the house was put it in place - the wonder and speed of timber frame construction. This second photo was taken around 3.30pm and the house is really taking shape. This view is from the northeast looking at the kitchen on the left, the front door location in the centre of this elevation and then the ground floor bathroom at the right.


Final photo is the view from the window of the guest bedroom. You can see the rain coming over the hills!