Wall Insulation

Thankfully we have plenty of storage space as the two main forms of wall insulation were delivered last week. The Rockwool Flexi 140mm batts are fairly standard, bulky, widely available and commonly used. The pavatex 'Pavatherm Plus' woodfibre board in the right of the picture is the non-standard element of our wall insulation. The latter is an insulating wood fibre board which is effective in reducing the U-value ie improving the thermal efficiency, in improving acoustic protection (not that we have any external noise problems!) and providing summer heat protection. It is used as an overcladding system for the timber frame in this application and will effectively 'block' most thermal through the frame and aid airtightness thus giving the best chance of this and the Rockwool insulation working at its best.

Today in the glorious sunshine the joiners made a start on the south gable. Also the suppliers of the Pavatherm board visited to discuss the product and its installation with the guys on site as well as Steve and I. Last winter when we were looking at specification/design issues for the house (that seems such a long long time ago!!!!!!) we had concern about it being an appropriate material in the wet West of Scotland as the insulation should be fixed dry but we were reassured by architects who had used it on self-builds in Scotland. The AECB also provided contacts through their forum which was beneficial in this sort of decision. The joiner had not used the product before but by the end of a very productive day he rated it very highly and enjoyed working with it.


On other matters the larch cladding arrived this afternoon but the timber frame manufacturer has sent the wrong profile so that will need to be replaced. Hopefully they will do this quickly. Also or architect has sent through revised details for the porch so that can go ahead now.

Slates have also arrived. The electrician and the chimney man are due tomorrow. Bathrooms and the 3 really large fixed and sliding windows are due on Wednesday. Bathrooms should have arrived last week but didn't...more chasing!

One Week On



Can't believe we haven't posted anything since last Tuesday....however its because so much has been happening on site. Aside from that we're very busy at home and work.

Saturday late afternoon we had our first snow of the year and there was a fair blizzard that evening. As usual at this elevation it thawed rapidly on the ground but the hills look fabulous. We have beautiful pink skies this morning - ideal for the slating to start today. Since last Monday the whole roof has been sheeted with sarking board, most of the windows are in place, the site has been tidied up, some scaffolding taken away, decisions on finer design detail made.


We had very wild weather and the joiners were on the roof a lot - it was so windy, wet and cold last week which was not pleasant at all.

Here's a few photos.............more news later.

Hens and Hedges


We've had company in the office today as one of the hens can't walk. At this stage we don't know if its a temporary state or permanent injury. Despite the impression created by this photo the hen's left leg has no power or weight bearing ability. So for today the hen has been in the warmth of the office in a box of hay with water and food; we're hoping the easy life will assist recovery but will see what tomorrow brings. On other matters I spent some time last weekend drafting a brief for tree and hedge planting around the farm. I've had good chats with the National Park landscape officer and trees person and a local contractor so hope to get some prices back soon. The planting season for bare root stock lasts until March time. The other element of this is really to get some trees growing - as to quote the original farmer's son "he didn't like trees" so there aren't too many round here. I'm keen to get a small orchard planted to reap fruit in years to come.

Roof progress & problems

Since last week when I mentioned that it hadn't rained much it has of course chucked it down most days this week! Ironically we had no water for most of yesterday as there was a burst water main somewhere on the west side of Loch Lomond which is a good distance from here.
Even the joiners finished early yesterday as they were soaked to the skin but this was also around the time that Steve and I realised/believed that some of the roof windows were not in the positions we had expected/designed. We arranged for the architect to visit site this morning....


The main problem was with the vertical position of the two main bedroom windows and the ensuite window, in that when standing up and viewed out from the inside, they are below level of vision! This is made even worse by the fact that the soffits from the top of the window frame are set square to the window (as shown in the photo above), which appeared to be an error that had crept into the final tender drawings. We were keen to resolve this asap as the sarking board is to be fitted next week with slaters booked the week after, and thus the opportunity will soon be lost (forever) to make adjustments.

Discussion on site with joiner and architect largely sorted the problem with an agreed plan to set the three offending windows higher in the roof, and an amended detail on the upper soffits to bring them closer to the horizontal as intended. As an aside, our joiner rightly cautioned this latter detail to ensure that sufficient insulation space is allowed for between soffit and sarking to avoid cold bridging and even condensation.

The view right is from the top of the scaffolding looking back to our 'trailer park' and some of the farm buildings. The office roof is just visibile to the right of the caravans.

Rather wierdly in the last week we've found 2 dead hares and a dead rabbit in different places around the steading area but none of them appear to have any injuries.....