Hens and Hedges


We've had company in the office today as one of the hens can't walk. At this stage we don't know if its a temporary state or permanent injury. Despite the impression created by this photo the hen's left leg has no power or weight bearing ability. So for today the hen has been in the warmth of the office in a box of hay with water and food; we're hoping the easy life will assist recovery but will see what tomorrow brings. On other matters I spent some time last weekend drafting a brief for tree and hedge planting around the farm. I've had good chats with the National Park landscape officer and trees person and a local contractor so hope to get some prices back soon. The planting season for bare root stock lasts until March time. The other element of this is really to get some trees growing - as to quote the original farmer's son "he didn't like trees" so there aren't too many round here. I'm keen to get a small orchard planted to reap fruit in years to come.

Winter sun, first snow...


It was a chilly, raw weekend, and we certainly felt it in the caravan! I just couldn't get my feet warm the whole weekend, so on Sunday afternoon took a stroll around the fields to capture progress 'from a distance' on ECF2 after so much time focussing on the nitty gritty detail.

What I saw took me back to our architectural brief for a building which had a 'sense of place' in this special landscape, a home which looked as if it belongs to its surroundings. With that in mind and seeing the entire 'mass' of the building through the scaffolding, I felt we were well on our way to realising that brief.
When starting out on this project we were keen to build a contemporary house which was simple in form, yet followed the lines of a traditional highland 'long-house' design.
An architectural practice which has pioneered this design code is Dualchas based in Skye (http://www.dualchas.co.uk/), not least as a reaction to kit house designs that have been more 'urban-American' than 'traditional Scottish' which have popped up in the Scottish landscape in recent years. We were quite taken by Dualchas's work at the time, whilst at the same time needed a local practice we could 'get involved with' in our house design and which knew what worked for the National Park where we live.

Heat Pump: Part 2 - ground loop installed!


Amongst the generous mix of mud, scaffolding and construction materials we're relieved to have the 300m of 40mm diameter heat pump 'collector' pipe safely buried 1.4m underground. This photo from the upper scaffolding shows the end result in the middle distance which should re-vegitate over next spring.

We are very fortunate in having an ideal location for this collector system, being on gently sloping ground with a high water table. This will ensure that that low grade 'heat' taken out of the ground will be quickly replenished by this water movement under the ground at pipe level, with heat transfer aided by the sand used to protect the pipe aganst sharp rocks when backfilled.

Roof progress & problems

Since last week when I mentioned that it hadn't rained much it has of course chucked it down most days this week! Ironically we had no water for most of yesterday as there was a burst water main somewhere on the west side of Loch Lomond which is a good distance from here.
Even the joiners finished early yesterday as they were soaked to the skin but this was also around the time that Steve and I realised/believed that some of the roof windows were not in the positions we had expected/designed. We arranged for the architect to visit site this morning....


The main problem was with the vertical position of the two main bedroom windows and the ensuite window, in that when standing up and viewed out from the inside, they are below level of vision! This is made even worse by the fact that the soffits from the top of the window frame are set square to the window (as shown in the photo above), which appeared to be an error that had crept into the final tender drawings. We were keen to resolve this asap as the sarking board is to be fitted next week with slaters booked the week after, and thus the opportunity will soon be lost (forever) to make adjustments.

Discussion on site with joiner and architect largely sorted the problem with an agreed plan to set the three offending windows higher in the roof, and an amended detail on the upper soffits to bring them closer to the horizontal as intended. As an aside, our joiner rightly cautioned this latter detail to ensure that sufficient insulation space is allowed for between soffit and sarking to avoid cold bridging and even condensation.

The view right is from the top of the scaffolding looking back to our 'trailer park' and some of the farm buildings. The office roof is just visibile to the right of the caravans.

Rather wierdly in the last week we've found 2 dead hares and a dead rabbit in different places around the steading area but none of them appear to have any injuries.....

Up on the Roof

Since last week's blog progress has been slow but steady. The roof is quite involved and various references have been made back to the timber frame manufacturer and the strucural engineer during the course of the week. To an extent it appears to be over-engineered (but I'm only a surveyor!) We employed a structural engineer to undertake much of the design as this was meant to save time with the timber frame manufacturer; I'm not sure this has been achieved and certainly the cost seems to be a good chunk higher. If we did this again we would handle this aspect differently but 'it is what it is'. The gloom of some dreich November days don't help and I'm beginning to hate the small cold caravan bathroom!!

On the plus side - the house is looking fabulous, we love the creation of the structure and its a pleasure to show people around. Our ever professional builder has put 3 additional joiners on site today to help get the roof structure finished. The first delivery of windows arrived last Friday and we bought the majority of the contents of the 3 bathrooms last week. The pavatherm external insulation is late but hopefully on its way, we've been chasing that delivery today. There's always something to do, as well as the day job which pays the bills. Last week we received the first interim certificate and invoice.


The photos were taken on Friday 23rd, illustrating the late Autumn sunshine at 8.30am; good light levels falling on the east elevation of the house (top photo). It was still below freezing as we'd had -4degC that night; but the views are glorious. The piccie above right is of the dining area, with its 3.5m ceiling height and lovely big window and door openings. The photo below is the view from this room to the north/northwest.